Means the movement of any switch or the insert of any fuse or the taking of any other step so as to enable an electrical current to flow between the Distribution System and the Customer’s Installation at the Connection Point.

Details the requirements to be met before any energization can safely start!


The Standard Operating Procedures document must be in line with the 3rd party electrical consultants commissioning plan.


Must explain the process flow to perform energization. Role players involved, the process to obtain a permit etc.