The 10 Minute Rule – Operational Discipline on Construction Sites
On most construction sites, productivity is measured in cubic metres poured, square metres tiled, or structural steel erected. It is rarely measured at 16:30, when the site is in condition. Yet one of the simplest and most powerful risk controls…
